The Nellis Solar Power Plant is located within Nellis Air Force Base in Clark County, Nevada, on the northeast side of Las Vegas. The Nellis solar energy system will generate in excess of 25 million kilowatt-hours (kW·h) of electricity annually and supply more than 25 percent of the power used at the base. The system was inaugurated in a ceremony on December 17, 2007, with Nevada Governor Jim Gibbons activating full operation of the 14 megawatt (MW) array.[2][3]
The Nellis Solar Power Plant coccupying 140 acres (57 ha) of land leased from the Air Force at the western edge of the base, this ground-mounted solar system employs an advanced sun tracking system, designed and deployed by SunPower. The system contains approximately 70,000 solar panels, and the peak power generation capacity of the plant is approximately 13 MW AC. This means the ratio of average to peak output, or capacity factor, of this plant is around 22%.
The Nellis Solar Power Plant energy generated will support more than 12,000 military and civilians at Nellis who are responsible for Air Force advanced combat training, tactics development and operational testing. Construction began on April 23, 2007, and operation of the first 5 MW began on October 12, 2007.Renewable portfolio standard
In 1997 Nevada passed a renewable portfolio standard (RPS) as part of their 1997 Electric Restructuring Legislation (AB 366) It required any electric providers in the state to acquire actual renewable electric generation or purchase renewable energy credits so that each utility had 1 percent of total consumption in renewables. However, on June 8, 2001, Nevada Governor Kenny Guinn signed SB 372, at the time the country's most aggressive renewable portfolio standard. The law requires that 15 percent of all electricity generated in Nevada be derived from new renewables by the year 2013.
The 2001 revision to the RPS keeps in place Nevada's commitment to expand solar energy resources by requiring that at least 5 percent of the renewable energy projects must generate electricity from solar energy.
In June 2005, the Nevada legislature passed a bill during a special legislative session that modified the Nevada RPS (Assembly Bill 03). The bill extends the deadline and raised the requirements of the RPS to 20 percent of sales by 2015
Expansion of Nellis Solar Power Plant
An extension of the plant, which could generate another 18 megawatts of power, has been proposed. The Air Force has not yet decided whether to have the extension built, and its potential cost and size have not been determined, but the military sees considerable operational advantages in solar power.
Nellis Solar Power Plant | |
---|---|
Country | United States |
Locale | Nellis Air Force Base, Nevada |
Coordinates | 36°15′30″N 115°03′10″W / 36.25833°N 115.05278°W / 36.25833; -115.05278 / 36.25833; -115.05278 |
Commission date | December 17, 2007 |
Owner(s) | Nellis Air Force Base |
Solar farm information | |
Type | Flat-panel PV |
Photovoltaic modules | 70,000 |
Land area | 140 acres (0.6 km2) |
Power generation information | |
Installed capacity | 14 MW |